Three Notched Trail (3NT) Shared-Use Path Master Plan
The Three Notched Trail Shared Use Path planning process is an exciting project that aims to create a multi-purpose trail connecting Charlottesville, Crozet, Albemarle County, and Nelson County. The Three Notched Trail will provide a safe, car-free route for locals and visitors, showcase the region's historic, natural, and agricultural resources, and support the local recreation and tourism economy.
We are working with a multidisciplinary team of planners, engineers, scientists, and civic engagement specialists to develop the Master Plan. The proposed trail will be approximately 24 miles long, and the planning process is estimated to take 24 months. During this timeContinue reading
The Three Notched Trail Shared Use Path planning process is an exciting project that aims to create a multi-purpose trail connecting Charlottesville, Crozet, Albemarle County, and Nelson County. The Three Notched Trail will provide a safe, car-free route for locals and visitors, showcase the region's historic, natural, and agricultural resources, and support the local recreation and tourism economy.
We are working with a multidisciplinary team of planners, engineers, scientists, and civic engagement specialists to develop the Master Plan. The proposed trail will be approximately 24 miles long, and the planning process is estimated to take 24 months. During this time, the team will evaluate viable options and seek public input. Three different routes will be drafted and evaluated as part of the study. Ultimately, one route will be selected as the preferred location, and preliminary plans will be developed for priority segments of the trail.
Get Involved
Throughout the planning process, we will provide a variety of ways for you to share ideas and provide feedback. Sign up for the project newsletter.
A Special Thank You to Community Advocates
We would like to thank the committed local organizations and passionate residents who demonstrated significant interest in creating a Three Notched Trail Shared Use Path; their support helped make this Master Planning Process possible.
-
Updated Map for Proposed Route (Route Unchanged)
Share Updated Map for Proposed Route (Route Unchanged) on Facebook Share Updated Map for Proposed Route (Route Unchanged) on X (formerly Twitter) Share Updated Map for Proposed Route (Route Unchanged) on Linkedin Email Updated Map for Proposed Route (Route Unchanged) linkThis map provides an updated version of the proposed shared-use path route presented at the October 26th Public Meeting. The proposed route has not changed; only the map presentation has been updated to make the information easier to view and understand.
-
Feedback requested on the Preferred Route
Share Feedback requested on the Preferred Route on Facebook Share Feedback requested on the Preferred Route on X (formerly Twitter) Share Feedback requested on the Preferred Route on Linkedin Email Feedback requested on the Preferred Route link
Albemarle County is eager to hear public feedback on the preferred route for the proposed Three Notched Trail. Please visit the project's Virtual Room for the following:
Overall map of the 24-mile corridor, broken into 6 zones
6 individual zone maps
6 zone descriptions
The survey closes on November 15th.
We send a sincere thank you to all who attended the Three Notched Trail Public Meeting on October 26th! For those who missed the meeting, you can view a video of the presentation here.
Albemarle County is eager to hear public feedback on the preferred route for the proposed Three Notched Trail. Please visit the project's Virtual Room for the following:
Overall map of the 24-mile corridor, broken into 6 zones
6 individual zone maps
6 zone descriptions
The survey closes on November 15th.
We send a sincere thank you to all who attended the Three Notched Trail Public Meeting on October 26th! For those who missed the meeting, you can view a video of the presentation here.
-
Community Meeting on October 26th
Share Community Meeting on October 26th on Facebook Share Community Meeting on October 26th on X (formerly Twitter) Share Community Meeting on October 26th on Linkedin Email Community Meeting on October 26th link
Join Us for the 3NT Community Open House on October 26th!
Albemarle County invites residents and community members to attend a Community Open House for the Three Notched Trail (3NT) Shared Use Path Master Plan.
Date: Monday, October 26
Time: 6:30 – 8:30 PM with presentation at 6:45PM
Location: Henley Middle School, 5880 Rockfish Gap Tnpk, Crozet, VA 22932Albemarle County and its planning partners have been working diligently to research potential trail routes and collect public feedback. Come see the County's proposed route for the 3NT and share feedback on which sections should be designed first.
The open house will have a presentation starting at 6:45pm, detailing the planning process and route development to date. If you are unable to attend the meeting, all information will be available online starting on Tuesday, October 27th.
Please note that this project is in the corridor planning stage only. Albemarle County is not currently requesting property commitments from landowners at this time. The full 24-mile trail would not be designed or built as a single project. Instead, shorter segments would likely be advanced to design and construction over time as funding becomes available. As a result, the exact trail location may not be determined for several years.
Join Us for the 3NT Community Open House on October 26th!
Albemarle County invites residents and community members to attend a Community Open House for the Three Notched Trail (3NT) Shared Use Path Master Plan.
Date: Monday, October 26
Time: 6:30 – 8:30 PM with presentation at 6:45PM
Location: Henley Middle School, 5880 Rockfish Gap Tnpk, Crozet, VA 22932Albemarle County and its planning partners have been working diligently to research potential trail routes and collect public feedback. Come see the County's proposed route for the 3NT and share feedback on which sections should be designed first.
The open house will have a presentation starting at 6:45pm, detailing the planning process and route development to date. If you are unable to attend the meeting, all information will be available online starting on Tuesday, October 27th.
Please note that this project is in the corridor planning stage only. Albemarle County is not currently requesting property commitments from landowners at this time. The full 24-mile trail would not be designed or built as a single project. Instead, shorter segments would likely be advanced to design and construction over time as funding becomes available. As a result, the exact trail location may not be determined for several years.
-
Project Update: July 2026
Share Project Update: July 2026 on Facebook Share Project Update: July 2026 on X (formerly Twitter) Share Project Update: July 2026 on Linkedin Email Project Update: July 2026 linkSince the December 2025 community event and online survey (which closed in February), our planning team has been performing additional technical analysis. The team has also been coordinating with key landowners whose property locations may affect the selection of one route over another.
The development of a single preferred trail route has been guided by the data and feedback we've received thus far. This includes considerations for safety, connectivity, and user experience. Public engagement on the project has been high, with over 4,000 comments received. Feedback has been largely positive and constructive. We invite you to review our summary ofContinue reading
Since the December 2025 community event and online survey (which closed in February), our planning team has been performing additional technical analysis. The team has also been coordinating with key landowners whose property locations may affect the selection of one route over another.
The development of a single preferred trail route has been guided by the data and feedback we've received thus far. This includes considerations for safety, connectivity, and user experience. Public engagement on the project has been high, with over 4,000 comments received. Feedback has been largely positive and constructive. We invite you to review our summary of the community feedback.
Because landowner outreach is a key focus of the current phase of work, we are planning to host a public meeting in late summer or early fall. We expect the meeting to be an open-house format, and we will invite landowners affected by the single, preferred trail route, as well as the broader community. Following the community meeting, we will invite feedback on the proposed preferred route, both in person and via an online survey.
Stay tuned for more details about ways to participate in this important planning effort!
-
Read the Phase Two Engagement Summary
Share Read the Phase Two Engagement Summary on Facebook Share Read the Phase Two Engagement Summary on X (formerly Twitter) Share Read the Phase Two Engagement Summary on Linkedin Email Read the Phase Two Engagement Summary linkWe send a sincere thanks to the community for sharing detailed feedback as part of the 3NT's Phase 2 public survey. The data collected on the various route options will help guide the selection of one preferred trail route. Community feedback will be used alongside other evaluation criteria, such as Connectivity, Accessibility, Constructability, User Experience, Safety, and Community Support, to inform the preferred route alignment. Each response shared by the public is valued and has contributed to the trail’s development.We send a sincere thanks to the community for sharing detailed feedback as part of the 3NT's Phase 2 public survey. The data collected on the various route options will help guide the selection of one preferred trail route. Community feedback will be used alongside other evaluation criteria, such as Connectivity, Accessibility, Constructability, User Experience, Safety, and Community Support, to inform the preferred route alignment. Each response shared by the public is valued and has contributed to the trail’s development. -
Feedback requested for trail route options
Share Feedback requested for trail route options on Facebook Share Feedback requested for trail route options on X (formerly Twitter) Share Feedback requested for trail route options on Linkedin Email Feedback requested for trail route options linkAlbemarle County is eager to hear public feedback on the various Three Notched Trail's proposed route options. Please visit the project's Virtual Room for the following:
Overall map of the 24-mile corridor, broken into 6 zones
6 individual zone maps
6 zone descriptions
Trail criteria ranking
The survey closes on January 31st.
Thanks to all who attended the Three Notched Trail Public meeting on December 4th! A video of the presentation will be available soon.

Albemarle County is eager to hear public feedback on the various Three Notched Trail's proposed route options. Please visit the project's Virtual Room for the following:
Overall map of the 24-mile corridor, broken into 6 zones
6 individual zone maps
6 zone descriptions
Trail criteria ranking
The survey closes on January 31st.
Thanks to all who attended the Three Notched Trail Public meeting on December 4th! A video of the presentation will be available soon.

-
Community Meeting on 12/4/25
Share Community Meeting on 12/4/25 on Facebook Share Community Meeting on 12/4/25 on X (formerly Twitter) Share Community Meeting on 12/4/25 on Linkedin Email Community Meeting on 12/4/25 linkShare feedback on the Three Notched Trail route options on December 4.
We are excited to share draft route options for the Three Notched Trail Shared Use Path and need YOUR input! Join us for a public meeting on December 4.
- Date: Thursday, December 4
- Time: 6-8 pm (with presentation at 6:15 pm)
- Location: Western Albemarle High School Cafeteria, 5941 Rockfish Gap Turnpike, Crozet, VA 22932
This proposed 24-mile trail will connect western Albemarle County, from Charlottesville to the Blue Ridge Tunnel, providing residents with safer, healthier transportation and recreation options. At the public meeting, you willContinue reading
Share feedback on the Three Notched Trail route options on December 4.
We are excited to share draft route options for the Three Notched Trail Shared Use Path and need YOUR input! Join us for a public meeting on December 4.
- Date: Thursday, December 4
- Time: 6-8 pm (with presentation at 6:15 pm)
- Location: Western Albemarle High School Cafeteria, 5941 Rockfish Gap Turnpike, Crozet, VA 22932
This proposed 24-mile trail will connect western Albemarle County, from Charlottesville to the Blue Ridge Tunnel, providing residents with safer, healthier transportation and recreation options. At the public meeting, you will be able to review multiple route options and provide feedback. We invite you to attend to share your thoughts and ideas to help shape the preferred route.
Join us on December 4 to:
- Learn more about the project and timeline
- Explore maps showing multiple route options
- Ask questions and share your feedback
- Help identify the trail’s preferred route and priorities
Can’t attend on December 4? Following the meeting, maps will be available online until January 31 to review and share feedback.
Note, this is a planning project. No land is being purchased, nor are trails being built at this stage. Your input will help shape the preferred route.
-
Read the Phase One Engagement Summary
Share Read the Phase One Engagement Summary on Facebook Share Read the Phase One Engagement Summary on X (formerly Twitter) Share Read the Phase One Engagement Summary on Linkedin Email Read the Phase One Engagement Summary linkThank you for the feedback shared in the initial 3NT public survey and during in-person events. You shared your ideas for a community-focused trail, identifying potential connections and challenges within the corridor. You shared your priorities and preferences. Take a look at the summary of public feedback.
Thank you for the feedback shared in the initial 3NT public survey and during in-person events. You shared your ideas for a community-focused trail, identifying potential connections and challenges within the corridor. You shared your priorities and preferences. Take a look at the summary of public feedback.
-
The summer feedback survey has closed.
Share The summer feedback survey has closed. on Facebook Share The summer feedback survey has closed. on X (formerly Twitter) Share The summer feedback survey has closed. on Linkedin Email The summer feedback survey has closed. link
The Three Notched Trail Master Plan's summer feedback survey has closed. The study team is evaluating the public's responses and is carefully crafting possible trail routes through the corridor. A public meeting will be planned for later this year to show various potential trail routes. Please sign up for the 3NT project email list to be notified of upcoming meetings.
The Three Notched Trail Master Plan's summer feedback survey has closed. The study team is evaluating the public's responses and is carefully crafting possible trail routes through the corridor. A public meeting will be planned for later this year to show various potential trail routes. Please sign up for the 3NT project email list to be notified of upcoming meetings.
-
Feedback form and mapping tool close August 31 - share your ideas today!
Share Feedback form and mapping tool close August 31 - share your ideas today! on Facebook Share Feedback form and mapping tool close August 31 - share your ideas today! on X (formerly Twitter) Share Feedback form and mapping tool close August 31 - share your ideas today! on Linkedin Email Feedback form and mapping tool close August 31 - share your ideas today! link
On May 15, 2025, Albemarle County hosted a public meeting in Crozet to obtain community feedback on the Three Notched Trail Master Plan. After a brief introduction of the project’s goals, meeting attendees were invited to share feedback at numerous interactive stations.
Recurring feedback included:
- Staying comfortably away from cars is key.
- Attendee’s primary intended trail use is for recreation and exercise.
- Attendees are excited about the “community” that being on the trail will bring.
- Residents are eager to have a very accessible trail, providing opportunities for all ages and abilities.
For those who missed the event but are eager to share feedback, please complete the survey and use the mapping tool by August 31, 2025.
On May 15, 2025, Albemarle County hosted a public meeting in Crozet to obtain community feedback on the Three Notched Trail Master Plan. After a brief introduction of the project’s goals, meeting attendees were invited to share feedback at numerous interactive stations.
Recurring feedback included:
- Staying comfortably away from cars is key.
- Attendee’s primary intended trail use is for recreation and exercise.
- Attendees are excited about the “community” that being on the trail will bring.
- Residents are eager to have a very accessible trail, providing opportunities for all ages and abilities.
For those who missed the event but are eager to share feedback, please complete the survey and use the mapping tool by August 31, 2025.
- Preferred Route and Segment Prioritization Survey: Share your feedback on the next steps for the proposed Three Notched Trail!
We are excited to share a few formats for viewing the proposed preferred options:
- Visit the Virtual Room
- View the Full Corridor Map
- Proposed Route – Updated Map (Route Unchanged)
- Access Individual Components
- View the slides of the October 26 Presentation
- Link to a video of the October 26 Presentation
-
October 26 2026
-
December 04 2025
-
May 15 2025
-
Data Collection
Three Notched Trail (3NT) Shared-Use Path Master Plan has finished this stageCollect and assess data on existing conditions.
-
Alternatives Analysis & Route Selection
Three Notched Trail (3NT) Shared-Use Path Master Plan is currently at this stageExplore different route options and select a final route.
-
Design Development
this is an upcoming stage for Three Notched Trail (3NT) Shared-Use Path Master PlanDevelop trail construction documents and outline steps for future trail implementation.
-
Implementation
this is an upcoming stage for Three Notched Trail (3NT) Shared-Use Path Master PlanAfter the 3NT Master Plan is complete, Albemarle County will seek additional funding through grants, local sources, and public-private partnerships to move forward with design and construction.
- What is the Three Notched Trail and where will it be located?
- What is the purpose of the Three Notched Trail Shared Use Path Master Plan?
- How will the public be able to share their ideas and trail vision with Albemarle County?
- When can I expect to be using the completed trail?
- Why is it called the Three Notched Trail?
- What would the Three Notched Trail look like?
- What are the benefits to having the trail on my property?
- What is a right-of-way?
- Where on my property are you proposing to put the trail?
- What is an easement?
- What are the options if my property is needed for the trail?
- Which option is right for me, fee simple versus easement?
- What impact would the trail have on my property taxes?
- What impact would the trail have on my property taxes?
- How would the trail affect my property values?
- What is my liability from allowing the trail on my property?
- What screening options are available for privacy?
- If I allow the trail on my property, who will maintain it?
- I have a conservation easement on my land. Does that prevent me from allowing this trail to be built?
- (Applies to trail adjacent to a railroad) Why can’t the trail be placed exclusively on the railroad’s property and not on my property?
- (Applies to trail adjacent to a public roadway) My property borders a roadway and the trail is proposed to follow that roadway. How does this affect my property?

-
Email kmcdermott@albemarle.org